Plan your conversion or change of use with a clear fire safety brief
A new use can change what a building needs from its escape routes, fire separation and protection systems. Spycon Security Ltd prepares fire strategy reports in Birmingham for owners, architects, developers and managing agents planning new accommodation, commercial alterations or mixed-use development.
We turn the project brief into a documented fire safety approach, identifying the design requirements, supporting evidence and outstanding decisions. The service includes design-stage and retrospective reports, with fire strategy drawings and submission support agreed in the quotation.
Domestic fire strategy reports start from £750 plus VAT for straightforward projects. Share your existing and proposed plans to establish the right scope.
What is a fire strategy report and why is it useful?
A fire strategy report explains the fire safety design of a particular building. It considers how occupants receive warning and escape, how construction and protective systems restrict fire and smoke, and what access and facilities are provided for firefighters. The report also records the building use, assumptions and management arrangements that the design relies on.
In a Birmingham house conversion, that can mean establishing how the proposed bedrooms, kitchen and shared stair work together. In an industrial alteration, it can mean assessing a new mezzanine and its effect on escape, compartmentation and the existing fire safety provisions.
The written strategy gives the architect, owner and specialist designers a common brief. Coordinated fire strategy drawings can show where the measures belong. A useful report explains the reasoning behind the requirements and highlights unresolved evidence, so decisions can be addressed before they are built into the project. Its conclusions relate to the particular building and drawings assessed.
The main types of fire strategy report
The appropriate report depends on the decision you need to make. The names below describe common service stages, rather than fixed legal certificate categories. A commercial, residential or HMO fire strategy may be prepared at several of these stages; the design method is selected separately for the building.
Feasibility and concept report
Before committing to a conversion layout, an initial strategy can identify whether the intended use creates constraints affecting stairs, exits, fire separation or firefighter access. For a house becoming an HMO, the review can establish which questions need answering before the room arrangement is developed. Conclusions may depend on further survey information.
Planning-support fire safety report
Some proposals need fire safety information during planning. The scope should follow the actual planning request and the stage of design. A planning Fire Statement, where applicable, addresses that process; it does not automatically provide the technical detail needed for the subsequent Building Control submission or specialist design.
Building Control design-stage strategy
The developed report explains the proposed fire safety approach, identifies the guidance or engineering basis and records the required provisions. For flats above a restaurant, it can clarify the design interfaces between the two uses. The report supports assessment of the submission, while the relevant approval body retains the decision.
Detailed design and construction coordination
An accepted principle must be carried into the architect’s, structural and services information. A construction-stage update can record changes to compartments, doors, shafts or protection systems and identify their implications. The appointment should distinguish reviewing design information from inspecting installations or supervising work on site.
As-built and handover report
At completion, the strategy should reflect the final arrangement and the assumptions that will govern occupation. Preparation depends on reliable final drawings, change records and supporting specialist information. It is useful to agree this deliverable early so the project team knows what evidence must be collected during the works.
Retrospective strategy or targeted strategy review
An existing industrial, residential or mixed-use building may need a retrospective assessment because its original strategy cannot be found. If a sound report already exists, a defined review or addendum may be enough for the proposed alteration. Both routes require the evidence and limitations to be clear; neither is a retrospective approval certificate.
Residential, HMO and commercial fire strategies
The service can cover houses, loft conversions, extensions, flats and apartment developments, with HMO enquiries assessed against their actual occupation and layout. Domestic fire engineering may be relevant where an open-plan arrangement or retained stair needs a more detailed technical assessment.
Commercial enquiries can include offices, retail units, restaurants, hotels, educational buildings, warehouses and industrial premises. For Birmingham changes of use, we need to understand both the existing building and the proposed activity. Mixed-use developments require coordination between occupancies, and specialist premises need an appointment matched to the competence and evidence the work requires.
Start with how the building will be used
Dividing a house into flats, creating an HMO or placing sleeping accommodation above a shop can change how occupants are protected. A shared stair may become a critical part of the proposal. Floor separation, service routes and access through another occupancy may also need closer assessment.
For an HMO proposal in Selly Oak, Edgbaston or Erdington, we review the intended occupation and escape arrangements alongside the building layout. For a conversion in Digbeth or the Jewellery Quarter, retained construction and adjoining uses may shape the assessment.
The aim is to identify the questions that affect the design while there is still time to address them. Where information is missing, the report states what needs to be established before the design can rely on it.
HMO, planning and Building Control requests
An HMO licensing enquiry, planning condition and Building Control submission can call for different information. Send the wording of the request as well as the plans. We can then define whether you need a fire strategy, an update to an existing report or another form of fire safety input.
For Birmingham projects, the report identifies the applicable England Building Regulations design basis. Approved Document B, relevant British Standards or a separately scoped fire engineering method may support that assessment, with the appropriate editions and project dates recorded.
Licensing requirements and design guidance should be considered in their proper context. An alarm category on its own does not explain the safety of an entire HMO, and a design report does not replace installation or testing records.
Commercial premises, industrial buildings and tenant alterations
For an office, restaurant or retail fit-out, we assess the implications of the proposed use, occupancy and escape arrangements. If the premises form part of a larger building, the landlord’s strategy and shared systems are important inputs.
Warehouse and industrial proposals may introduce a mezzanine, enclosed rooms, different storage arrangements or increased occupation. Tell us what the building will actually contain and how it will operate. Those details help define the assessment and any specialist information needed.
The commission can also cover hotels, educational premises, apartment developments and mixed-use buildings. Technical scope and competence are agreed for the particular project.
What your fire strategy report covers in detail
Building description, design basis and evidence
The report establishes the building use, storeys, relevant dimensions, occupancy and scope of the works. It identifies the plans and other documents reviewed, the assessment method and important assumptions. For an existing property, a distinction is needed between information supported by records, accessible conditions observed during a survey and matters that remain unverified.
Means of escape and evacuation
The assessment considers how occupants reach a place of safety, including travel distances, exit capacity, protected corridors and stairs, final exits and the effect of different uses. The evacuation approach must suit the building and its occupants. A stay-put arrangement, simultaneous evacuation or another approach needs an appropriate design basis; the choice cannot be made from the property label alone.
People who may need assistance must be considered. A refuge can form part of an agreed assisted-evacuation arrangement, but providing a refuge does not by itself explain how someone will reach safety. The strategy should identify relevant design and management responsibilities without assuming that every occupant can use stairs unaided.
Fire resistance, compartmentation and doors
Walls, floors, shafts, doors and fire-stopping work together to restrict fire and smoke spread and protect escape routes. The report identifies the relevant compartment boundaries and performance requirements. Openings for services, junctions and later alterations need coordination so that an intended fire-resisting line is maintained. A drawn compartment boundary does not prove the condition of concealed construction.
Internal and external fire spread
The design considers relevant internal lining performance and external spread issues involving walls, roofs, openings and boundaries. The information needed depends on the proposal and the available evidence. A fire strategy does not automatically include an intrusive external wall appraisal, material testing or a detailed assessment of every façade component; any such work needs an appropriate specialist scope.
Fire protection systems and their interfaces
Detection and alarm, emergency lighting, smoke ventilation and suppression may contribute to the strategy. The report identifies their intended roles and relevant design requirements. Automatic opening vents, door releases, smoke-control equipment and other interfaces need coordinated specialist design. System layouts, calculations, installation, commissioning and maintenance documentation remain separate deliverables unless expressly included.
Firefighter access and facilities
Depending on the building, the assessment addresses appliance approach, access within the premises and relevant firefighting facilities. Risers, hydrants, firefighting shafts and associated provisions need suitable location and design information where applicable. Site constraints should be identified early, including access routes or shared areas controlled by others, so the strategy does not rely on an arrangement the project cannot provide.
Applying the scope to changes of use
A Birmingham proposal for flats above a shop needs information about both parts of the property. The assessment may depend on the floor between them, service penetrations and whether escape routes remain independent. For a warehouse mezzanine, the intended storage and occupation matter alongside the new floor area. These details help establish which questions need architectural changes, further evidence or specialist analysis.
Fire strategy drawings for the design team
An agreed AutoCAD package can show escape routes and final exits, travel distances, protected stairs, compartment lines, fire doors and performance requirements. Relevant smoke ventilation or AOV provisions, refuges, firefighting access, risers and hydrants can also be identified where applicable to the building. A clear legend distinguishes the different requirements.
For mixed-use Birmingham premises, the plans should make the interface between occupancies understandable, including common routes and service crossings. The strategy drawing is a coordination document; it does not replace a specialist system layout, installation certificate or the evidence needed to establish the condition of retained construction.
Retrospective fire strategies for Birmingham buildings
If the building is already in use and no reliable strategy can be found, we start with the available evidence. Useful records include floor plans, previous approvals, fire risk assessments, alteration history and inspection reports.
The agreed survey checks accessible conditions against those records. A retrospective strategy can explain the existing arrangements and identify gaps that require investigation or improvement. It cannot establish the condition of hidden construction without suitable evidence.
We distinguish the design conclusions from separate work such as a compartmentation survey, external wall appraisal or fire door inspection. That gives the owner a clearer basis for commissioning the next action.
Which regulations and BS standards apply in Birmingham?
Birmingham projects use the applicable England Building Regulations framework. Approved Document B addresses fire safety through B1 warning and escape, B2 internal linings, B3 structure and compartmentation, B4 external fire spread and B5 fire service access and facilities. The appropriate guidance depends on the building, proposed work and relevant project dates.
British Standards or a fire engineering method may provide an appropriate design route within their scope. Their use needs a coherent explanation, including any departures and interfaces. Planning, HMO licensing and Building Control remain separate processes. Where work falls within the relevant higher-risk building regime, its Building Safety Regulator requirements must be considered expressly rather than assumed to be covered by a standard domestic commission.
BS 9991:2024 for residential buildings within its scope
BS 9991 addresses fire safety in the design, management and use of residential buildings within its scope. A strategy using this route may examine protected stairs, common corridors, compartmentation, fire doors, warning, smoke control, fire resistance, evacuation and firefighting facilities. The selected approach must suit the actual building. The presence of accommodation does not automatically make every residential or specialist premises suitable for the same method.
BS 9999:2017 for suitable buildings within its scope
BS 9999 can support a risk-based approach for suitable buildings such as offices, retail premises, hospitality, industrial premises and warehouses. Occupancy characteristics, fire risk and management assumptions influence the assessment of escape and protection measures. It is not a code for individual dwelling houses. A strategy should apply the relevant provisions coherently rather than selecting isolated allowances from different routes.
BS 7974:2019 and the supporting PD 7974 series
BS 7974 provides a framework for applying fire safety engineering principles. A specialist assessment starts with defined objectives and a qualitative design review, then uses appropriate analysis to evaluate potential solutions against agreed criteria. Relevant parts of the PD 7974 series can support the methodology. This route is useful when a specific design question needs engineering analysis; it is not an automatic requirement for every report.
Standards for the systems supporting the strategy
Related system standards can include BS 5839-1 for non-domestic fire detection and alarm systems, BS 5839-6 for systems in domestic premises, BS 5266-1 for emergency lighting and the relevant BS EN 12101 standards for smoke-control components or systems. The strategy identifies the required function, while specialist designers confirm applicable standards, editions and detailed specifications for their work.
British Standards are technical standards, not the legislation itself. The report should state the selected design basis, applicable editions and any departures, with the reasons and supporting evidence. It should explain how the chosen standards address your building’s design, so you can understand the requirements and any limitations.
Fire engineering, CFD modelling and alternative designs
Some buildings need a more detailed assessment of an open-plan arrangement, retained stair, basement, atrium or another feature that does not follow a conventional guidance solution. The first step is to define the departure and the safety objective. A competent specialist then identifies relevant fire scenarios, occupants, assumptions, analysis methods and acceptance criteria. The scope may include calculations or modelling, with suitable technical review.
CFD means computational fluid dynamics. In an appropriate fire engineering study, it can help examine smoke movement and conditions in a defined scenario. Its value depends on justified inputs, a suitable model and careful interpretation. A visual simulation alone is not evidence that a proposal is acceptable.
Available Safe Egress Time (ASET) concerns the time available before the specified conditions become untenable in the scenario assessed. Required Safe Egress Time (RSET) considers the time needed for detection, warning, occupant recognition and response, and movement to safety. Where this comparison is used, the assessment needs suitable safety margins and consideration of uncertainty; a simple numerical comparison is insufficient on its own.
The findings may support additional detection, smoke control, suppression, improved compartmentation, fire-resisting construction or different escape arrangements. The appropriate measures follow the analysis. An engineered solution does not promise that walls, stairs or sprinklers can be avoided. Specialist modelling, calculations and review are separately scoped and priced where justified.
Fire strategy report, fire risk assessment or certificate?
These documents answer different questions. Knowing the purpose helps you commission the correct service:
- Fire strategy report: explains the building’s fire safety design, its assessment basis and the measures and assumptions that work together.
- Fire risk assessment: examines fire risks and precautions in the premises as used, including management matters and actions. It can identify a need for design clarification, but does not automatically supply that technical assessment.
- Fire strategy drawing: illustrates relevant design provisions on the plans. It accompanies the assessment where commissioned; a drawing alone may not explain the reasoning or limitations.
- Fire alarm certificate: records a specified design, installation, commissioning or maintenance activity for the alarm system. It does not certify the whole building’s fire strategy.
- Evacuation plan: explains the operational arrangements for getting people to safety, including assistance where needed. It must be consistent with the strategy and actual building management.
- Fire alarm zone plan: helps identify alarm zones and locations. It has a different purpose from the coordinated escape, compartmentation and protection information in fire strategy drawings.
Send the exact wording of any request from an authority, assessor or managing agent. We can then identify the appropriate document and any related services that need a separate scope.
How your Birmingham fire strategy is prepared
- Establish the request. Send the site address, plans, intended use and any licensing, planning or Building Control correspondence. Tell us whether the project is a conversion, new build, commercial alteration or existing-building enquiry, together with the deadline you are working towards.
- Confirm the appointment. We define the report stage, information required, survey and travel arrangements, drawing package and technical review. The quotation also identifies specialist work and the allowance for design revisions or authority comments, so the deliverables are clear before assessment starts.
- Develop the fire safety approach. The assessment connects the layout, occupants, construction and protection systems. Questions affecting other designers are identified for coordination. For a mixed-use project, this includes the relationship between occupancies and relevant shared routes or systems.
- Review the coordinated information. The report and agreed drawings are checked under the technical review arrangements, with assumptions and outstanding evidence recorded. The issued documents identify the design assessed and provide the agreed information for the relevant submission.
- Support changes and handover. Submit later drawings and comments for review within the appointment. If a final strategy is commissioned, suitable completion evidence is needed. Where Regulation 38 applies in England, the owner’s handover package needs the relevant fire safety information; the report should be coordinated with final drawings and specialist records rather than treated as the entire package.
Professional credentials, review and insurance
Our fire-safety team includes professionals holding Member grade of the Institute of Fire Safety Managers (MIFSM) and Associate membership of the Institution of Fire Engineers (AIFireE). Spycon Security Ltd holds IFSM affiliate membership, a company affiliation separate from individual professional membership.
Your appointment identifies the competent author and technical reviewer responsible for the report and its sign-off. Work is matched to the competence required; professional membership or an electrical qualification alone does not establish competence for every complex fire engineering assessment.
Professional Indemnity, Public Liability and Employers’ Liability insurance is arranged through NAPIT, subject to the relevant policies, insured activities and limits.
Fire strategy report cost in Birmingham
Straightforward domestic reports start from £750 plus VAT. The fee for an HMO, commercial property or larger residential scheme depends on the size, complexity, available records and deliverables required.
The quotation identifies survey and travel costs, drawings, specialist assessments, technical review, delivery timing and the allowance for revisions or authority comments. If the design changes after appointment, we explain the resulting scope before additional work proceeds.
Send the site address, existing and proposed use, plans, storey information and any authority correspondence. For a fit-out, include the landlord’s current strategy if available.
Birmingham areas and West Midlands enquiries
Enquiries include the city centre, Jewellery Quarter, Digbeth, Aston, Nechells, Edgbaston, Harborne, Selly Oak, Bournville, Moseley, Kings Heath, Hall Green, Yardley, Acocks Green, Erdington, Perry Barr, Handsworth, Northfield and Sutton Coldfield.
The Birmingham and surrounding postcode catchment includes B1–B21, B23–B38, B40, B42–B48 and B72–B76. Wider enquiries include Solihull B90–B94, Smethwick B66–B67 and West Bromwich B70–B71.
We also welcome project details from Halesowen, Oldbury, Bromsgrove, Redditch and Tamworth, and relevant DY, WS, WV and CV districts. Postal areas cross council boundaries; site visits and any travel allowance are confirmed using the full property address.
Birmingham fire strategy questions
Can you assess flats above a restaurant or shop?
Yes, subject to the agreed scope. We need information about both uses, their escape routes, shared services and separation. Plans showing only the flats may leave important parts of the assessment unresolved.
Is a retrospective report a retrospective approval?
No. It documents an existing building’s fire safety arrangements within its scope. Any regularisation or other approval requirement is a separate matter for the relevant authority.
Can we use the same report for an HMO licence and Building Control?
Some information may be relevant to both, but the requests and decision processes differ. Send both sets of requirements so the commission can identify what the report will address.
Will you answer comments on the submitted strategy?
The quotation states the review support and revision allowance. Forward the complete comments and the latest plans so any additional assessment can be identified.
Can an engineered solution keep our open-plan staircase?
The layout and its proposed protection need assessment before a conclusion is possible. An engineering study may identify a supportable approach, or it may show that changes or additional measures are needed. No particular staircase arrangement can be promised acceptable from an outline description alone.
Do new builds and older buildings use the same assessment?
The core fire safety questions overlap, but the evidence and purpose differ. A new design can specify proposed construction; an existing property may require records and investigation to establish what is present. The report should make that distinction clear.
How long will the report take?
The programme depends on the scope, complete information, survey access and specialist work. Send your submission deadline at enquiry stage. The quotation confirms an achievable programme and identifies information or decisions needed before the assessment can be completed.
Discuss your Birmingham plans
Call 020 4600 4703 or send your drawings, proposed use and project deadline for a fire strategy quotation.
Request my Birmingham fire strategy quote