Approved Document B
&
Fire Engineering Solutions for Residential, Commercial and Mixed-Use Buildings

A fire strategy should explain how a building’s fire-safety measures work together, how occupants can escape and how the design addresses the relevant fire-safety requirements.

At Spycon Security Ltd, we prepare Fire Strategy Reports across London for domestic properties, residential buildings, HMOs, commercial premises, mixed-use developments, conversions, refurbishments and new projects. Where Approved Document B provides an appropriate design approach, we use the relevant guidance and explain how it applies to the building. Where a conventional approach is unsuitable, we can scope a fire engineering assessment with appropriately competent personnel. Specialist calculations, modelling and technical review are agreed separately, with responsibility assigned to the relevant author and reviewer. This can be particularly useful for existing London properties where the structure, layout, available space or proposed development creates difficulties for a conventional arrangement. The objective is to establish a safe, proportionate and technically justified approach for the particular building.

Fire Strategy Reports for Different Property Types

We prepare fire strategy reports for:
• Houses and domestic properties.
• Flats and residential blocks.
• Loft conversions.
• Extensions and refurbishments.
• HMOs.
• House-to-flat conversions.
• Commercial-to-residential conversions.
• Change-of-use projects.
• Offices.
• Shops and retail premises.
• Restaurants and hospitality premises.
• Hotels.
• Warehouses.
• Industrial premises.
• Educational buildings.
• Mixed-use developments.
• New-build projects.
• Existing buildings.
• Retrospective fire strategies.
• Projects requiring Building Control technical information.

Every report is developed around the building’s layout, use, occupancy, construction, height and proposed work.

Approved Document B Fire Strategy

The Prescriptive Design Route

Approved Document B provides guidance on meeting the firesafety requirements of the Building Regulations in England. The relevant volume, amendments and transitional provisions need to be considered for the particular project. An ADB-based fire strategy can address the following areas.

Depending on the building, we consider:
• Escape routes and final exits.
• Travel distances.
• Exit widths and capacity.
• Protected stairs.
• Protected corridors.
• Dead ends.
• Inner rooms.
• Evacuation arrangements.
• Fire detection and warning.
B2 — Internal Fire Spread: Linings

The strategy can consider the reaction-to-fire performance of relevant internal wall and ceiling finishes.

This can include:
• Compartmentation.
• Fire-resisting walls and floors.
• Protected shafts.
• Structural fire resistance.
• Fire doors.
• Fire stopping.
• Service penetrations.
Depending on the building and agreed scope, this can include:
• External walls.
• Openings.
• Balconies.
• Roofs.
• Boundary conditions.
• Fire spread between buildings.
Relevant considerations can include:
• Fire appliance access.
• Firefighter access.
• Firefighting stairs and shafts.
• Dry risers and wet risers.
• Hydrants.
• Firefighting lifts.
• Other firefighting facilities.

For straightforward projects, an ADB-based strategy may provide the clearest route. Projects that fall outside the suitable application of prescriptive guidance may need a different design approach.

MIFSM, AIFireE and Professional Responsibility

Our fire-safety team includes Member grade of the Institute of Fire Safety Managers, using MIFSM, and Associate membership of the Institution of Fire Engineers, using AIFireE. Spycon Security Ltd holds IFSM affiliate membership. Individual professional membership grades and company affiliation are separate credentials. Your appointment identifies the competent author and technical reviewer responsible for the report and its sign-off. The work is matched to the competence required by the project. Professional membership or an electrical qualification alone does not establish competence for every complex fire engineering assessment.

Fire Engineering Solutions London

Support for Buildings With Design Constraints
Existing properties may have features that make a conventional arrangement difficult to achieve, including:
• Restricted staircases.
• Unusual floor plans.
• Open-plan layouts.
• Extended travel distances.
• Structural constraints.
• Limited space for compartmentation.
• Unusual basements.
• Complex loft conversions.
• Existing construction that is difficult to alter.
• Mixed-use arrangements.
• Historic or architecturally sensitive features.

Where appropriate, a fire engineering assessment can investigate the building’s fire scenarios, occupants, escape arrangements, fire development, smoke movement and available protective measures.
Depending on the question being assessed, the scope may include:
• Performance-based fire safety design.
• Alternative design assessment.
• Compensatory measures.
• Evacuation assessment.
• Smoke movement assessment.
• Tenability assessment.
• ASET/RSET analysis.
• Fire modelling.
• CFD modelling.
• Enhanced detection.
• Smoke control.
• Fire suppression.
• Improved compartmentation.
• Alternative escape arrangements.
Specialist analysis is undertaken by personnel competent for that work. The appointment defines the methodology, inputs, acceptance criteria, limitations and review requirements. Advanced modelling is not automatically necessary for every project.

ADB, BS 9991, BS 9999 or Fire Engineering?

The appropriate design route depends on the building.

one

Approved Document B

Where the relevant ADB guidance provides a suitable solution, the report explains how the design addresses that guidance and the applicable requirements.

two

BS 9991:2024

For residential buildings within its scope, BS 9991:2024 may provide an appropriate approach to fire safety in design, management and use.

three

BS 9999:2017

For suitable non-residential buildings within its scope, BS 9999:2017 provides a risk-based design approach.

four

BS 7974 and the PD 7974 Series

Where a performance-based fire engineering assessment is necessary, the principles of BS 7974 and relevant parts of the PD 7974 series may inform the assessment. The report explains the selected design basis, assumptions, assessment methodology and proposed fire-safety measures. Different approaches need to be applied coherently, with departures and interfaces properly justified.

Fire Engineering for Domestic Properties

Fire engineering can also be relevant to domestic and residential projects. For example, an existing house may have an open-plan arrangement or staircase configuration that makes a conventional protected escape route difficult to achieve. An initial review can establish the problem, identify available options and determine whether an alternative arrangement warrants a more detailed assessment. Relevant considerations may include:
• Occupancy and number of storeys.
• Escape routes and travel distances.
• Stair protection.
• Fire separation.
• Fire doors.
• Detection and alarm.
• Smoke movement.
• Compartmentation.
• Fire-resisting construction.
• Existing building constraints.
• Management assumptions.
• Proposed compensatory measures.

An engineering assessment may identify a technically supportable alternative. It does not promise that structural alterations, suppression or other protective measures can be avoided, and it does not guarantee Building Control approval.

BS 9991:2024 Residential Fire Strategy

For a residential building within its scope, a BS 9991-based strategy may address:

The design approach is selected for the particular building. BS 9991 is not applied automatically to every residential project.

BS 9999:2017 Commercial Fire Strategy

For suitable non-residential buildings, a BS 9999-based strategy can be relevant to:

Depending on the project, the assessment may consider:

BS 7974 Fire Engineering Assessment

Where performance-based analysis is required, a specialist assessment may consider:

Calculations and modelling must answer a defined design question. Their usefulness depends on justified inputs, suitable methods and clear interpretation of the results.

Fire Strategy Drawings & AutoCAD Plans London

Where included in the appointment, we prepare AutoCAD Fire Strategy Drawings to accompany the written report. Drawings can identify:

The drawings are coordinated with the report so that the design team and approval body can understand how the proposed measures fit together.

Assessing Alternative Fire-Safety Solutions

An alternative design needs a clear technical explanation. Depending on the project, the assessment process can include:
1. Identifying the departure from the conventional approach.
2. Establishing the fire-safety objective.
3. Identifying relevant fire scenarios.
4. Assessing occupants and evacuation.
5. Considering fire development and smoke movement.
6. Identifying additional or compensatory measures.
7. Carrying out calculations or modelling where necessary.
8. Recording assumptions and limitations.
9. Explaining why the proposed solution is considered appropriate.
10. Providing information for the relevant approval process.

Potential measures may include enhanced automatic detection, natural or mechanical smoke ventilation, AOV systems, fire suppression, improved compartmentation, fire-resisting construction, fire doors, alternative escape arrangements and appropriate management controls. The measures are selected according to the assessment findings.

Fire Strategy for London Planning — Policy D12

Planning-Stage Fire Safety For relevant developments, London Plan Policy D12 addresses fire safety at the planning stage. Where a planning Fire Statement is required, early consideration can include:
• Fire appliance and firefighter access.
• Means of escape.
• Evacuation.
• Fire spread.
• Firefighting facilities.
• Building layout.
• Active and passive fire protection.
• Access and servicing arrangements.

A planning Fire Statement and a detailed Building Regulations Fire Strategy have related purposes, but their scope and level of detail can differ.
We establish the document and information needed for the relevant project stage.

Gateway 1, Gateway 2 and Gateway 3

Planning Gateway 1 and the higher-risk building control process have different scopes. Broadly:

Gateway 1 concerns planning-stage fire safety for relevant development.

Gateway 2 concerns building control approval before relevant construction work begins.

Gateway 3 concerns completion approval within the applicable higher-risk building process. Not every building is subject to these procedures. Specialist higher-risk building work, Gateway 2 or Gateway 3 submissions and wider approval support require an express appointment and suitable competence.

Regulation 38 Fire Safety Information

Where Regulation 38 applies, relevant fire-safety information
needs to be provided at completion to support the management
and maintenance of the building.
Depending on the project, this may include information about:
• The fire strategy.
• Compartmentation.
• Fire doors.
• Fire-resisting construction.
• Fire alarm systems.
• Smoke control.
• Firefighting facilities.
• Other fire-safety systems.
• Maintenance requirements.
The information must reflect the completed building and the
responsibilities of the project team.
A Regulation 38 information package is distinct from a Fire Risk
Assessment.

Retrospective Fire Strategy London

Existing Buildings With Missing or Outdated Fire-Safety Information

A retrospective fire strategy can be useful where the original
report is missing, incomplete or no longer reflects the building.
This may follow:
• Extensions.
• Loft conversions.
• Internal alterations.
• Changes of use.
• Flat conversions.
• HMO conversions.
• Refurbishment.
• Changes to escape routes.
• Changes to compartmentation.
The report can establish the existing fire-safety arrangements and identify matters requiring further investigation or improvement. Where necessary, a survey can review:
• Building layout.
• Escape routes.
• Fire doors.
• Compartmentation.
• Stair protection.
• Fire alarm systems.
• Smoke ventilation.
• Firefighting facilities.
• Visible existing construction.
The report distinguishes verified conditions from information
taken from drawings and assumptions requiring confirmation.
Concealed construction may require separately scoped
compartmentation, fire-door or external-wall investigation.

HMO Fire Strategy London

HMOs need consideration of the shared escape routes and the
way occupants use the premises.
A strategy may address:
• Bedroom layouts.
• Common escape routes.
• Protected stairs.
• Fire doors.
• Compartmentation.
• Detection and alarm.
• Emergency lighting.
• Travel distances.
• Smoke control.
• Firefighting facilities.
Building Regulations design requirements need to be considered alongside applicable HMO licensing conditions and other firesafety obligations.

London Fire Brigade Guidance

Commercial & Mixed-Use Fire Strategy London
Mixed-use buildings can combine occupancies with different
risks and evacuation arrangements.
Examples include:

Building Control Fire Strategy Support

Building Control queries may concern:

Where included in the agreed scope, we review technical
comments and provide clarification, amended drawings or report revisions. The relevant approval body determines acceptance. Our role is to provide technically supported information and respond to comments within the appointment.

What Does a Fire Strategy Report Include?

The contents depend on the building and report stage. A typical scope covers all key aspects of fire safety design and compliance.

Report Section Information Addressed
Project description Building use, size, height, storeys and proposed works
Design basis Applicable requirements, guidance, standards and assumptions
Means of escape Routes, travel distances, exits and evacuation arrangements
Compartmentation Walls, floors, shafts, fire doors and fire stopping
Internal fire spread Linings and structural fire protection
External fire spread External walls, openings, balconies and boundary conditions where relevant
Detection and alarm Fire-warning strategy
Smoke control Natural or mechanical ventilation where required
Emergency lighting Relevant design provisions
Firefighting facilities Access, risers, hydrants and other facilities
Fire engineering Separately scoped alternative solutions, calculations or modelling
Drawings AutoCAD fire strategy plans where included
Assumptions and limitations Unverified information, dependencies and matters requiring confirmation

Fire Strategy Report vs Fire Risk Assessment

A Fire Strategy Report explains the building’s fire-safety design and how its protective measures are intended to work. A Fire Risk Assessment evaluates the fire risks at the premises and the measures needed to manage those risks. Depending on the project and its stage, you may need one or both.

Fire Strategy Report Cost London

Domestic Fire Strategy Reports From £750 + VAT
Straightforward domestic fire strategy reports start from £750
plus VAT The final fee depends on:
• Building size and number of floors.
• Project complexity.
• Existing or proposed construction.
• Site survey requirements.
• Quality of architectural drawings.
• AutoCAD drawing requirements.
• Fire engineering assessment.
• Calculations.
• CFD or other modelling.
• Evacuation modelling.
• Building Control support.
• Revision allowance.
• Project timescale.
Larger residential, commercial and mixed-use projects are quoted individually. Your quotation identifies the report stage, survey, drawings, technical review, revisions and approval support included. It also confirms the delivery programme and information needed from you. Changes to the layout or brief may affect the fee and programme. Additional engineering, modelling or consultation is agreed before proceeding.

Our Fire Strategy Process

Send your drawings

Provide architectural plans, sections, elevations and project information.

Initial review

We review the building, proposed use and likely fire-safety issues.

Agree the scope and design route

The appointment defines the assessment, deliverables and responsibilities.

Site survey where needed

Existing conditions are reviewed within the agreed inspection scope.

door [#45]Created with Sketch.

Develop the strategy

The relevant fire-safety arrangements are assessed.

damage_kinetic

Complete specialist analysis where commissioned

Any engineering work follows its agreed methodology and review arrangements.

Prepare drawings where included

Fire-safety information is shown on coordinated plans.

Technical review

The written report, drawings and assumptions are checked for consistency.

report-text

Issue the report

Documentation is issued for the agreed project stage.

Provide agreed support

Technical comments and revisions are addressed within the appointment.

Why Choose Spycon Security?

• Fire strategy support for residential, commercial and mixeduse buildings.
• An appropriate design route selected for the actual project.
• MIFSM and AIFireE professional memberships within the team.
• IFSM affiliate membership held by Spycon Security Ltd.
• Named responsibility for report preparation and technical review.
• AutoCAD fire strategy drawings where included.
• Retrospective strategy support for existing buildings.
• Defined Building Control support and revision arrangements.
• Clear distinction between conventional strategy work and separately scoped specialist engineering.

Professional Indemnity, Public Liability and Employers’ Liability insurance is arranged through NAPIT, subject to the relevant policies, insured activities and limits. Separately instructed electrical work has its own competent personnel, testing and sign-off. Responsibility for the fire strategy remains with its appointed author and reviewer.

Request a Fire Strategy Report London

Whether you are planning a loft conversion, HMO, residential
conversion, commercial refurbishment, change of use or new
development, we can review your information and identify the
appropriate scope.

Fire Strategy Reports Across London

We provide Fire Strategy Reports across all 32 London boroughs
and the City of London:
Barking & Dagenham, Barnet, Bexley, Brent, Bromley, Camden,
Croydon, Ealing, Enfield, Greenwich, Hackney, Hammersmith &
Fulham, Haringey, Harrow, Havering, Hillingdon, Hounslow,
Islington, Kensington & Chelsea, Kingston upon Thames,
Lambeth, Lewisham, Merton, Newham, Redbridge, Richmond
upon Thames, Southwark, Sutton, Tower Hamlets, Waltham
Forest, Wandsworth and Westminster.
Whether your project is in North, South, East, West or Central
London, the strategy is based on the individual building.

Frequently Asked Questions

Yes. ADB is an appropriate starting point for many projects where its guidance provides a suitable design approach.

We can review the departure and available options. Where
appropriate, a separately scoped fire engineering assessment
can investigate an alternative.

Yes. It may be relevant to complex domestic or residential
projects where a conventional arrangement is difficult to achieve.

It may reduce the need for some alterations, but this cannot be
promised before assessment. Other protective measures may
still be necessary.

Where appropriate, BS 9991:2024 can inform residential work
within its scope, and BS 9999:2017 can inform suitable nonresidential projects.

These can form part of a separately scoped specialist
assessment where necessary, with competent practitioners and defined technical review.

Yes, where included in the quotation.

Yes. The scope establishes the information available, survey
requirements and any construction details requiring further
investigation.

Yes, within the agreed scope of technical support and revisions.

No. Acceptance is determined by the relevant approval body.

Send the property address, existing and proposed plans,
sections, elevations, building use, height, occupancy, proposed
works and any relevant authority comments.